Your browser is no longer supported

For the best possible experience using our website we recommend you upgrade to a newer version or another browser.

Your browser appears to have cookies disabled. For the best experience of this website, please enable cookies in your browser

We'll assume we have your consent to use cookies, for example so you won't need to log in each time you visit our site.
Learn more

Papers presented at Braunschweig Landfill Conference

Landfill construction and capping seals

Evaluation of landfills using fuzzy logic (Schaup & Walz) UK developments in vertical sealing systems for landfills (Gallagher) Deformations of mineral barriers - results of large scale tests (Edelmann) Damage to capping systems due to waste body settlements (Ziehmann) Stability of waste bodies (Kolsch) Cap sealing of landfills, an area of boundless engineering creativity? (Ruppert & Brockhaus) Innovative systems of cappings for landfill (Hoins) Cap sealing with modified mineral sealing materials (Melchior) Bentonite mats as landfill cap sealing layer - 10 years' experience (Egloffstein) Cap sealing systems with capillary barriers - new research results and case histories (Steinert & Melchior) Asphaltic sealing caps (Franke & Savidis) Asphaltic sealing caps, or the opportunity of commercial and industrial re-use of a capped historic landfill (Nolte) Cracauer Anger Landfill, Magdeburg - securing, sealing and recultivation of a landfill and incorporation into the 1999 Federal Garden Show (Grubert & Bosse)

Cut-off wall technology

On the applicability of the break strain of mineral cut-off walls as a tender criterion (Feeser, Murdel, Hahn & Marten) Clay-cement cut-off wall mix for the two phase method, results from research and practice (Brinkmann) Self-healing capacity of cut-off walls (Scholz, Schultz, Woitkowitz & Marten) Risk determination for faults in horizontal and vertical seals (Geil & Hemker) Investigation of system permeability of cut-off walls (Schroder & Schultz) Quality control with single phase cut-offs - supplementary methods to estimate cut-off wall quality with examples from selected projects (Schwartz & Adnan) Quality assurance measurement techniques in cutoff wall construction (Friedrich & Ruppert) Measurement of and protocols for progress of diaphragm walling during installation (Tiefenbacher) Report on experience with cut-off construction and remediation of a historic landfill (Nendza & Luhmann) Groundwater diversion system for a vertically encapsulated landfill (WeiBETA) Cut-off and capping of Haveleck Landfill, BerlinSpandau (Lindner)

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions. Please note comments made online may also be published in the print edition of New Civil Engineer. Links may be included in your comments but HTML is not permitted.