Your browser is no longer supported

For the best possible experience using our website we recommend you upgrade to a newer version or another browser.

Your browser appears to have cookies disabled. For the best experience of this website, please enable cookies in your browser

We'll assume we have your consent to use cookies, for example so you won't need to log in each time you visit our site.
Learn more

Ramboll designs twin replacement bridges for Bermuda

Longbird brudge, bermuda

Ramboll has received government backing for its twin replacement bridge designs to link Bermuda’s airport to the rest of the nation’s islands.

The Bermuda Bridges concept will now move to a detailed design phase, following a public consultation on the proposal.

The bridges are needed to replace two ageing crossings that have connected LF Wade International Airport with capital city Hamilton to the west and the town of St Georges to the east for over 50 years.

Detailed designs for the bridges will now be drawn up over the next six to nine months, with construction expected to begin next summer and a completion scheduled for 2021.

A bascule bridge with a distinctive curved soffit, providing a 22m wide shipping channel giving access to St George’s harbour, will replace one of the current bridges. A 54m fixed twin arch bridge is set to replace the other ageing bridge.

Each will carry two lanes of traffic with separated lanes for cyclists and pedestrians. In both cases the existing strategic crossings will remain fully operational while the new structures are completed.

Ramboll bridges director Steve Thompson said: “The positive response to the designs at the public information session is excellent news.

“The bridges successfully address the challenges created by a corrosive climate while delivering a superb aesthetic, which is great news for everyone on the island or visiting the island.”

Ramboll has been acting as lead consultant on the project, with Knight Architects and Eadon Consulting also involved. 

Like what you’ve read? To receive New Civil Engineer’s daily and weekly newsletters click here. 

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions. Please note comments made online may also be published in the print edition of New Civil Engineer. Links may be included in your comments but HTML is not permitted.