Your browser is no longer supported

For the best possible experience using our website we recommend you upgrade to a newer version or another browser.

Your browser appears to have cookies disabled. For the best experience of this website, please enable cookies in your browser

We'll assume we have your consent to use cookies, for example so you won't need to log in each time you visit our site.
Learn more

Green signal for rail-mounted rig

News

RAILTRACK HAS granted engineering acceptance and route acceptance certification for UK foundation contractor Aarsleff Piling's rail-mounted piling rig (Ground Engineering May 2001).

The rig is based on equipment developed by Aarsleff Piling's Danish parent Per Aarsleff which has been used for over 20 years on Danish, Spanish, Polish, Swedish, and Italian state railways.

Aarsleff believes the rig is the only rail-mounted piling rig to have full certification and approval for use on UK and mainland European rail networks.

It is designed to be hauled in train formation outside of possessions at up to 96.5kmh and to be self-propelled at up to 16kmh inside possessions. It can handle, pitch and drive piles up to 6m long in a single piece and up to 4.25m away from the track centre line. All piling operations are controlled from the operator's cab.

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions. Please note comments made online may also be published in the print edition of New Civil Engineer. Links may be included in your comments but HTML is not permitted.