Your browser is no longer supported

For the best possible experience using our website we recommend you upgrade to a newer version or another browser.

Your browser appears to have cookies disabled. For the best experience of this website, please enable cookies in your browser

We'll assume we have your consent to use cookies, for example so you won't need to log in each time you visit our site.
Learn more

CONTRACTS

Simplex Foundations is installing 2,750 piles for a warehouse in Melton Mowbray, Leicestershire.

The work includes 2,100 flared head piles of 350mm diameter and up to 18m deep.

The flared heads are up to 900mm in diameter and are formed using a proprietary technique developed by Simplex which allows the pile and head to be cast as a single piece. A further 650, 350mm and 600mm diameter bearing piles are being installed.

Half of the piles are designed for ground heave and Simplex used two, 12m long T25 reinforcement bars per pile. Pile load ranges are up to 1,400kN in compression, 500kN in tension and 150kN in shear. The firm has been using four Soilmec CM48 CFA rigs installing 'a mile' of piles per day.

The 20,000 m 2warehouse for Asfordby Storage and Haulage will be 25m high.

Have your say

You must sign in to make a comment

Please remember that the submission of any material is governed by our Terms and Conditions and by submitting material you confirm your agreement to these Terms and Conditions. Please note comments made online may also be published in the print edition of New Civil Engineer. Links may be included in your comments but HTML is not permitted.